The Great Gate Company, Unit 6 First Avenue, Westfield, RADSTOCK BA3 4BS.  Registration no 5101583, Call us on 01761 568 084

Supply only or Supply and Fit. Discounts for Trade

Online Shop

Email: Sales@thegreatgatecompany.co.uk

The Great Gate Company
Custom made gates and railings
DESIGN, MANUFACTURE AND INSTALLATION

Tel.:    01761 568084       Mob 0781 730 8727

Email Enquiry
Arch Assembly

1. All the nuts and bolts should be provided.

2. Lay out the arch pieces on the grass.

3. Start with the sides and then do the arch top last.   Make the arch before installing it.










5. The distance between the side pieces of the arch at the base is intended to be as follows:

Narrow width    -   1100mm (3’7”)
Standard width  -   1350mm (4’5”)
Wide width        -  1830mm (6’) at the base of a standard arch
Bespoke width       

Mark the position of the side pieces in the ground before you erect the arch. This will make sure that you get a true arch shape.

6. The push in legs are designed to be pushed in to a distance  of 300mm.  









8. If your arch has been galvanised it will not rust.  Occasionally a white deposit or stain may leach through during the first few months.  This is nothing to worry about and can be wiped off with a damp cloth.  

We hope that you will get many years of pleasure out of your arch.  If you have any queries about installation, please call 01761 568084.

7. Your arch has been painted with a hammerite paint, which is readily available from hardware stores.  You can repaint the arch using any good quality metal paint suitable for exterior use.


4. Assemble the middle nut and bolt first and then the outer ones.  Do up loosely to start with and then tighten when all are in position.  


Use two spanners to fix the nut and bolt, one to hold the bolt in place and the other to do up the nut. Only tighten them up when you have all the nuts and bolts in place finger tight.  Tighten the middle ones first.

Email Enquiry