We worked with both the architect and structural engineer to achieve sympathetic period addition to this stunning property.
This was an interesting challenge as we were required to hide complex joints to ensure clean lines.
Part of the brief was to have a structure that could incorporate a bespoke laser-cut floor.
It was designed and built in a modular fashion to minimise installation time.
Feel free to give us a call on 01225 811367 or by email at sales@thegreatgatecompany.co.uk